国产成人无码专区,国产精品亚洲产品一区二区三区,色综合天天综合婷婷伊人,久久久不卡国产精品一区二区

歡迎來(lái)到,深圳市芬德電子科技有限公司官網(wǎng)!

finder功率繼電器

聯(lián)系電話(huà):0755-84552800

手機(jī)號(hào)碼:189-2606-1910

News
熱門(mén)搜索: Motor automation equipment、 Enclosure、 Product 40 series55 series、 38 series、 Series 80...

News

Shenzhen Fende Electronic Technology Co., Ltd

Address: d1001, Vanke building, No. 7188, Longxiang Avenue, Longgang District, Shenzhen

Tel: 0755-84552800/01/02/03
Fax: 0755-0755-28891512

Email:sales@ff-energy.com

Industry trends

Wiring method of finder power relay

文章出處:芬德電子科技 / 作者:芬德電子科技 / 發(fā)表時(shí)間:2022-05-24

1. Connect correctly according to the external wiring diagram, and pay special attention to that the voltage and current connected to this device must be phase A and phase C, and the same polarity terminal connected to the current transformer is correct.


2. Turn on the power, and the "power" indicator light is on. When the toggle switch is placed in the "test" position, the finder power relay and the unloading "out of limit" indicator light will be on, and an alarm signal will be output. After a few seconds of delay, the "action" indicator light will be on, but the reverse power and unloading output finder power relay will not act, indicating that the internal logic function of the device is normal. The delay time is the reverse power and unloading delay time respectively, and its value can be adjusted by the "reverse power delay time" adjusting potentiometer (lower left) and the "unloading delay time" adjusting potentiometer (lower right), and clockwise is the increasing direction. Then turn the toggle switch to the "run" position.

Note: the time interval of the second test should be greater than 30 seconds. Otherwise, the "delay time" of the second test will be shorter.


3. When the units operate in parallel, the voltage remains rated so that a unit can reverse its power. When a certain value is reached, the reverse power "over limit" indicator light is on. After the delay, the "action" indicator lights up, and the finder power relay will trip the main switch. The reverse power unit is listed. The action power can be adjusted through the "action power adjustment potentiometer" (located at the upper left), which is the increasing direction clockwise. If the finder power relay acts when a single machine is running at positive power, the wiring of terminals 1 and 2 should be replaced.

78.jpg

4. Setting of unloading action value and delay time:

Turn the "action current" clockwise to adjust the potentiometer (upper right) to the maximum value. Increase the load current of the generator to the value that needs to be unloaded, and then slowly adjust the potentiometer counterclockwise until the "out of limit" indicator light is on, and then start timing until the "action" indicator light is on, and the secondary load is unloaded, which is the delay time of the action of the unloading device.

Users can request the setting value when ordering and set it when leaving the factory.

Overall dimension: width × high × Thickness =150 × one hundred and five × 68; Installation size: 140 × 954- Φ five

Wiring method of power direction relay

Connection method between relay and current transformer and voltage transformer.

The following requirements shall be met:

(1) It is necessary to ensure that the power direction relay has good directivity. That is, any type of fault in the forward direction can act, but the reverse fault will not act.

(2) Try to make the power direction relay more sensitive in case of forward fault, φ K approach φ sen。

遂川县| 平舆县| 北流市| 芦山县| 洮南市| 庆安县| 亳州市| 龙川县| 珲春市| 伊金霍洛旗| 绥滨县| 五家渠市| 达孜县| 介休市| 河津市| 萨迦县| 根河市| 奇台县| 惠安县| 乌拉特中旗| 观塘区| 衡阳县| 湾仔区| 山阳县| 阿坝县| 徐水县| 溧水县| 洛川县| 甘孜县| 翼城县| 秀山| 甘谷县| 贺州市| 扎赉特旗| 清水县| 龙海市| 桦川县| 卢湾区| 瓮安县| 馆陶县| 上饶市|